Stamped Calculations & Drawing Fee:
~$3700Plan Turnaround Time:
3 weeksPermit Approval Time:
5 months
Project Scope:
Prepared structural calculations for a modified framing system to incorporate an elevator installation
Modified the framing systems of lower floor, upper floor and roof to accommodate the elevator shaft and overrun