Garage Conversion into ADU​

Palo Alto, CA​
Stamped Calculations & Drawing Fee:
~$3500
Plan Turnaround Time:
3 weeks
Permit Approval Time:
2 months
Project Scope:

Converted an existing detached garage into a new 1-story custom ADU​

Designed structural drawing and calculation sets for the full foundation, floor framing, lateral resisting system and roof framing​